Network 65 Industrial Build

Peri Legwear is an 8 week contract running alongside the manor carehome, this project involves KPP architects from leeds who are over looking the job with ourselves.

The industrial unit was an open space to where we had to build a two storey office extension. At present we have built the ground floor walls with 6inch block and the first floor in metal studding to reduce the weight load on the concrete slab. First fix electrical and plumbing has been done and we are on with drylining the premises ready for plastering. Watch this space as the project moves on!